Design, quote and close solar jobs in one place Solar Company

The all in one platform for Australian solar retailers and installers to manage leads, design proposals, and run projects from a single screen.

• Try for Free • Cancel any time • Watch Demo
AktisHub Design

Solar Design

John Smith - 8.1kW Solar with 41.94kWh battery

High Quality Image

HD

Trusted by Australia's leading Solar & Battery Companies

Book Demo
Sunbeam Sunbeam
Solar
&
Electrical
Eagle Solar Eagle
Solar
WA Solar WA
Solar
Company logo SolarGen
Eagle Electric Eagle
Electrics

#1 Solar CRM & Design Software All in one software for Solar Businesses

AktisHub is built to streamline every part of your solar workflow from lead capture to project delivery. It brings your teams, data, automation, and customer communication into one unified platform. Just a system designed for the real challenges solar companies face: fewer errors, clearer oversight, and predictable growth. Start designing and managing leads on CRM.

Solar & Battery Design

Solar & Battery Design

Single Line Diagram

Single Line Diagram

Shading Simulator

Shading Simulator

Lead Automation

Lead Automation

Proposal with e-sign

Proposal with e-sign

Manage Strings via DC Cable

Manage Strings via DC Cable

Get started with SolarHub today

Watch demo Get started

Before

Managing sales and customers manually slows your team down, creates errors, and wastes valuable time.

After

Run everything from one smart CRM—automated, organized, and built for modern teams.

Sign-Up for Free
SolarHub CRM Dashboard
SolarHub CRM Mobile
Built for solar operations

One platform for your entire solar workflow

From first lead to final sign-off — manage every job, proposal, and install in a single connected workspace.

Give your office and field teams a cleaner shared workflow with less admin and better visibility.

250+ Solar Companies
250+ Quotes Generated
5+ Advance Features

Leads slipping through the cracks? Centralized Lead Hub

All leads in one place with automated workflows and smart assignment. Never miss a follow-up.

Auto-capture leads
Smart reminders
Lead Management

Wasting hours on amateur proposals? Professional Proposals in Minutes

Generate professional, accurate proposals 10x faster with calculations and professional templates.

5-min generation
E-signature ready
Proposal Builder

Clients can't visualize the result? Create Designs Instantly

Generate and revise professional solar sketches, slashing your proposal preparation time.

Live status
Client portal
Project Dashboard

Losing Potential Leads? Sign Contracts Digitally within minutes

Sign and review contracts Digitally through our online system.

Margin protection
Approval workflows
Pricing Control

Difficult to track Jobs/Leads? All In One Platform

Replace expensive tools with one affordable solution. Save money, save time, work smarter.

Save $500+/month
Single sign-on
All-in-One Platform

Trusted by Solar Professionals

Real results from Australian solar businesses

Pricing

Simple, transparent pricing

Choose the plan that fits your solar business. No lock-in contracts.

Free

Perfect for trying out our solar CRM platform.

Free forever
  • 50 tokens per month
  • 25 solar or battery quotes
  • Unlimited heat pump & kW size reports
  • Up to 500 leads stored
  • 5 designs per month
  • Up to 3 users

Standard

Everything growing solar teams need to scale.

$ 29 /Month
  • 300 tokens per month
  • 30 designs included (10 tokens/design)
  • 3 lead source integrations
  • Multiple options per design
  • 5 users included (+$4.99 per extra user)
  • Priority email support

Pro

Purpose-built for high-volume enterprise teams.

$ 199 /Month
  • 2,000 tokens per month
  • 200 designs included (10 tokens/design)
  • Unlimited lead source integrations
  • Advanced workflow automations
  • 20 users included (+$4.99 per extra user)
  • Dedicated account manager
Product Demo

See SolarHub in Action

Watch how solar teams generate quotes in seconds, automate designs, and reclaim 40+ hours every week.

SolarHub CRM product demo preview
Watch Demo  ·  3 min
Trusted by 250+ Australian solar businesses

Ready to Swap Chaos
for Control?

A 15-minute demo is all it takes to see how SolarHub gives you back 40+ hours a week — so you can close more deals, stress less, and grow faster.

40+ Hours saved
per week
250+ Solar teams
on platform
3× Design to Quotes
within minutes
No contract No credit card Cancel anytime